English
  • English
  • 中文
  • Русский

English
  • English
  • 中文
  • Русский

    Home  >  Application Cases

Guizhou Panbei Coal Preparation Plant Application Case (2025)



I. Project Overview
Project Name: Guizhou Panzhou Panbei Coal Preparation Plant UPS Power Supply Assurance Project (2025) Appied Product: Bodiantong Brand Industrial-grade Power Frequency UPS Power Supply BOD Series Project Background: As a key washing and processing supporting facility within the Panjiang Coal and Electricitsystem, Guizhou Panbei Coal Preparation Plant is undergoing a technical upgrade in 2025. Post-upgrade, its washing capacity will be enhanced to 3 million tons/yea undertaking core businesses such as coking coal washing and special coal processing, making it a critical link in the regional coal industry chain. In the coal washing production process, core equiph as centrifuges, raw coal grading screens, crushers, and variable frequency control systems require 24-hour continuous operation. However, the site is subject to electrical interference and voltage fluctuaer anomalies not only lead to production interruptions and coking coal loss but also risk damaging expensive electromechanical equipment, resulting in significant economic losses. Therefore, dur2025 project upgrade, a reliable industrial-grade UPS power supply system is urgently needed to ensure production continuity and equipment safety.


II. Core Customer Requirements
(1) Ensure continuous power supply throughout the coal washing process, eliminating the impact of municipal power outages, voltage fluctd electrical interference on core production equipment and control systems, and avoiding risks of production downtime and equipment damage.

(2) Adapt to the characteristics of the coal washing plant's industrial enviroich features high dust levels and complex electrical conditions. The equipment possesses strong anti-interference, high-voltage resistance, and dust-proof heat dissipation capabilities, enabling long-term stable oand reducing O&M costs.

(3) The equipment is easy to operate and supports intelligent monitoring, allowing for real-time monitoring of power operation parameters. This facilitates remote management and predictive faudetection by O&M personnel, thereby improving O&M efficiency.

(4) Align with the coal washing plant's capacity upgrade requirements for 2025, featuring flexible scalabilitt allows for convenient expansion of power capacity in response to future increases in production load, reducing subsequent equipment investment.


III. Solutions and Product Applications
Combining the power load after the 2025 capacity upgrade, on-site envint, and core requirements of Panbei Coal Preparation Plant, we have customized a dedicated solution featuring the Bodiantong Industrial-grade Power Frequency UPS Power Supply BOD Series. We selected modelapted to the high loads and harsh environments of the coal washing industry to provide comprehensive power protection for the core electromechanical equipment and control systems of the entire production workshop. The specific applicae as follows:

(1) Product Selection: Based on precise calculations of the power load of the upgraded production line, we selected the Bodiantong BOD Series three-phase inputphase output double-conversion online UPS power supply. This series covers power ratings from 10kVA to 1200kVA and supports power expansion via redundant parallen, perfectly matching the current load after the customer's 2025 capacity upgrade and future expansion needs.

(2) Core Adaptation: The product utilizes 6th genIGBT devices and advanced SVPWM space vector modulation technology, with dual-core DSP full digital control. It features a wide input voltage range (380±25%) and comut isolation, effectively resisting utility voltage fluctuations and electrical interference. It ensures output voltage precision remains stable at 380±1%, providing pure and stable power supply to core equiph as centrifuges and variable frequency control systems, avoiding equipment damage and loss of clean coal.

(3) Intelligent O&M: Equipped with a large Chinese LCD touch screen, it supports multiple network monitoring interfaces including RS232, RS485, and RJ45, with optional Wi-Fi functionality. O&M personnel can monitor the UPS operating stin real-time via mobile phones or computers, promptly identifying and addressing potential faults, reducing O&M difficulty and labor costs, and meeting the coal preparation plant's needs for efficient operation and maitenance.

(4) Environmental Adaptation: Adopting industrial-grade high-stan


IV. Project Outcomes
After the Bodiantong BOD series industrial-grade industrial frequency UPS power supply was put into use in 2025, it perfectly resolved the power supply assurance challenges following the capacity upgrade of the Panbei Coal Preparation Plant, facilitating the smooth implementation of the project and achieving significant results:
1. Stable Power Supply: Achieved a 0-millisecond switch between utility power and battery power, completely eliminating issues such as utility power outages and voltage fluctuations. It ensures the 24-hour continuous and stable operation of core production equipment, effectively avoiding production delays, coal loss, and equipment damage caused by power anomalies, thereby reducing economic losses.

2. Convenient Operation and Maintenance: The intelligent monitoring system significantly reduced the workload of maintenance personnel, allowing real-time tracking of equipment operating parameters and early prediction of faults. With a low equipment failure rate and significantly reduced maintenance costs, the operational efficiency of the coal preparation plant was improved.

3. Strong Adaptability: The product is fully adapted to the harsh industrial environment of the coal preparation plant, operating stably and reliably. It meets the enterprise's power demands for high-load, long-duration continuous production, facilitating the smooth achievement of the 2025 capacity upgrade goals and earning high recognition from the client.

4. Flexible Expansion: The redundant parallel technology reserves expansion space for future capacity increases, allowing for convenient power capacity expansion without additional equipment modifications. This reduces the enterprise's future equipment investment costs and provides support for its long-term development.


V. Customer Feedback
The project manager of the Panbei Coal Preparation Plant stated: 'During our plant's capacity upgrade in025, the BOD series UPS power supply from Bodiantong, with its stable performance and strong environmental adaptability, completely resolved the issue of unstable power supply during our production process. It effectivelye continuous operation of the production line and avoided economic losses caused by power anomalies. The product is easy to operate and maintain, and its industrial-grade quality and comprehensive after-sales service have prorong support for our plant's capacity upgrade and stable development. It is a trustworthy UPS power supply brand.'


About Us

Industry Applications

Service

Contact Us

National Service Hotline:
400-831-8938

Contact Email:
liruiming@brotherpower.cn

Copyright By ©Guangdong Boltcomm New Energy Technology Co., Ltd   

 Technical Support: BCNIC

Copyright ©
Guangdong Boltcomm New Energy Technology Co., Ltd

 Technical Support: BCNIC

添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了