Project Overview
In 2025, Bodiantong's BOD Series industrial-grade industrial frequency UPS power supply successfully won the bid for Package 8 of the power supply system procurement project for the Phase I (Airport to New Railway Station Section) of the Astana New Transport System Light Rail Project. As a key project of the 'Belt and Road Initiative' and a China-Kazakhstan production capacity cooperation project, this is the first fully automated driverless light rail line in Central Asia. With a total length of 22.4 kilometers, it connects 18 stations and multiple urban landmarks. Bodiantong provides comprehensive uninterrupted power supply guarantees for core electrical equipment along the entire line, facilitating the implementation of Chinese standards in Central Asia, demonstrating the strength of 'Made in China,' and safeguarding the intelligent development of Astana's urban rail transit.
Core Customer Requirements
(1) 7×24-hour uninterrupted power supply to ensure the stable operation of the light rail fully automated driveless system, signaling control system, platform monitoring, emergency lighting, and ticketing systems, eliminating major risks such as train stoppages and data loss caused by municipal power anomalies and grid flutuations.
(2) Adapt to the complex climate of Astana with extreme cold and heavy snow, as well as diverse outdoor scenarios such as elevated tracks and vehicle depots; resist low tatures, wind, snow, vibration, and electromagnetic interference to output clean power, ensuring the safe and long-term operation of precision industrial control equipment.
(3) Support intelligent remote monitoring and maance to meet the needs of unattended light rail operations; achieve real-time monitoring of equipment operating parameters, automatic fault alarms, and remote troubleshooting, reducing cross-border inspection costs and improving maintenancfficiency.
(4) Possess industrial-grade high reliability and compliance, meeting international standards for power supply in the rail transit industry and maintenance regulations of both China and Kazakhstan; provide timelyles response to support the project's long-term stable operation and cross-border service requirements.
Customized Solutions
Combining the cross-border nature of the Astana Light Rail Phase I project, the characteristics of the extreme cold envint, and core power requirements, Bodiantong has customized a tailored solution with the following core advantages:
(1) Precise Selection and Adaptation: Based on the varying power loads acrosentire light rail line, stations, and vehicle depots, equipment power is configured rationally to cover all power needs, including unmanned driving, signaling, and monitoring. Expansion space is reserved, fully complying with relevant international rail transit industry standards and project-specific requirements.
(2) Zero-Interruption Power Supply Assurance: Adopting a double-conversion it achieves zero-millisecond switching and pure sine wave output. This effectively isolates grid fluctuations, voltage distortion, and electromagnetic interference, ensuring seamless and stable operation of core processes such as t control and ticketing data transmission, eliminating the risk of service disruption.
(3) Extreme Environment Adaptation: The equipment PCB boards are coated with a three-proofing varnish,aired with a wide-temperature design, allowing stable operation in environments ranging from -20°C to 60°C. It possesses excellent moisture-proof, dust-proof, anti-vion, and wind/snow resistance capabilities, perfectly adapting to Astana's extremely cold and snowy climate.
(4) Intelligent Cross-Border O&M: Equipped with an LCD touch operation ie and remote monitoring system, it supports multi-language operation. It enables real-time monitoring of equipment status, automatic fault alarms, and remote troubleshooting and debugging, significantly reducing cross-border manual inspon costs and improving O&M response efficiency.
Project Outcomes
Upon project implementation, the Bodetong BOD series UPS power supply achieved zero power outages and zero failures for core electrical equipmens the entire Phase I of the light rail line. It effectively mitigated operational risks caused by abnormal utility power and extreme weather, ensuring the safe and stable operation of fully automated driver trains. The intelligent operation and maintenance system significantly reduced the pressure of cross-border inspections and labor costs, while the clean power supply extended the service life of precision equipment. The high reliability and emental adaptability of the products have garnered high recognition from the general contractor and the Kazakh owner, providing reliable power support for China-Kazakhstan rail transit cooperation and telt and Road' infrastructure construction.
Customer Testimonial
Project General Contractor Representative: 'The Bodetong BOD Series industrial-grade industrial frequency UPS power supply demonstrates exceptional product quality and technical cmpatibility. It perfectly meets the stringent demands of Astana's extreme cold climate and the fully automated operation of the light rail system. With stable and reliable operation, its intelligent O&M fuignificantly improved cross-border maintenance efficiency. Timely after-sales support has eliminated our concerns, providing solid power assurance for the smooth progress and long-term stable operation of the project, highlighthe hard-core strength of Chinese power equipment.'